
New Padel Facility: Start to Finish
Drones captured every stage of a new padel facility, from site work to the final reveal of three courts, lounge seating and pervious concrete.

- Client
- Hale & Son Construction (concrete)
- Industry
- Sports & recreation construction
- Service
- Construction progress, final aerial reveal
- Date
- May 2026
- Location
- Green Valley Country Club area, PA
The brief
A new padel facility is a showcase for its builders as much as its owners. The craftsmanship, especially the pervious concrete work, deserves to be seen from above.
What we did
- Aerial coverage at each stage of the build, start to finish
- Detail passes on the concrete work poured by Hale & Son Construction
- Final aerial “reveal” showing the three courts, modern lounge seating and custom padel ball dispensers
The result
A before-to-after record that highlights the craftsmanship, scale and atmosphere of the finished build. Built with precision, captured from the air.
Shared by the contractor: “Padel Court loading!”
More case studies
View all
Roche Molecular Diagnostics
A campus tour teaser: aerial flyover and construction progress at a major diagnostics site.
Read the case study →
Penn Medicine Cancer Center
Weekly drone flights and interior inspections on a new cancer center in Princeton, NJ.
Read the case study →
Rutgers Medical School Integration
A video series telling the story of the Rutgers New Jersey Medical School and Robert Wood Johnson Medical School integration.
Read the case study →Ready to see your project from above?
Tell us what you are building, selling or celebrating. We will plan the right flight.